Tent Camper Cable Drive Lifter Repair Procedure |
![]() |
||||||||
![]() |
|||||||||
SPRING CHANGE PROCEDUREIt is important when changing springs to do only one end of the camper at a time. The roof should be down before repairing to take pressure off of the system. Refer to attached drawing for parts (A through Q) locations.
CABLE REPLACEMENT PROCEDURE |
|||||||||
![]() |
|||||||||
System should be ready to use. You may put more grease in the master tube. If front and back of the roof do not start up at the same time you need to adjust the pulley (M). To Raise front of roof earlier adjust pulley forward to raise rear move pulley toward back of unit. |
|||||||||
Spring Length Chart For Cable System1994-2001 Single Post Value Line Freedom / Mac and 1995-2001 Single Post Low Wall Mid Line Premier / Classic
1999 - 2001 Single Post High Wall Mid Line Premier / Classic and 1998 - 2000 Signature
2001 Double Post Value Line & Mid Line
NOTE: All springs shipped will be 146'' in length (part # L-323) and should be cut to the above lengths. 2004 HW Units
|
|||||||||
Cable Length Chart for Cable SystemPART # L-39 / YELLOW - 202'' O.A., 69'' P.P.
PART # L-34 / PURPLE - 265'' O.A., 93'' P.P.
PART # L-41 / BLACK - 276'' O.A., 115'' P.P.
PART # L-57 / RED - 292'' O.A., 133'' P.P.
O.A = Overall Length P.P.= Push Pull Length |
|||||||||